1. Nowadays, many battery car charging piles are wholesaled by manufacturers, and the wholesale price through manufacturers will be reduced.For operators who want to buy charging piles, it is very cost-effective to wholesale from manufacturers.
2. ATE-8603 switching power supply automatic test system (DC-DC) is suitable for the characteristic test of switching power supply such as AC/DC or DC/DC power supply, adapter, battery charger, etc. It is tailor-made and optimized for standard test items. It has good test performance and meets a large number of Production test requirements.
3. The charging pile detection equipment recommends the XL-942S/943S charging pile on-site characteristic tester, which can meet the test needs of metrology verification, interoperability detection and protocol consistency detection, and meet the requirements of the testing items in the acceptance stage and operation stage of the national network. And the equipment is highly integrated and portable.
1. First of all, the AC charging pile test project includes the appearance inspection and functional test of the charging pile. The testers will carefully check the appearance of the charging pile, including the integrity of the shell, whether the connector is intact, whether the display and buttons are normal, etc.
2. Charging pile detection project function test: charging function control test, communication function test, insulation detection function test, vehicle plug locking function test, pre-charging function test.
3. It can provide reliability test item services: environmental reliability test, electromagnetic compatibility EMC test, and IP protection level test, etc. Common reliability test services include: vibration, impact, drop, high and low temperature, salt spray test, as well as mold, photoaging and other experiments, and nationally recognized CMA test reports are issued.
XL-942S charging pile test equipment cooperates with XL-3603 load to meet the test requirements of metrology verification, interoperability detection and protocol consistency detection, and meet the requirements of testing projects in the acceptance stage and operation stage of State Grid Document No. 45.
Reliability can provide some test item services: environmental reliability test, electromagnetic compatibility EMC test, and IP protection level test, etc. Common reliability test services include: vibration, impact, drop, high and low temperature, salt spray test, as well as mold, photoaging and other experiments, and nationally recognized CMA test reports are issued.
"JJG 1149-2018 Electric Vehicle Non-vehicle Charger Verification Regulations" Test Project. JJG 1148-2018 Electric Vehicle Non-vehicle Charger Verification Procedures" Test Project. GB/T 34651-2017" Conduction Charging Interoperability Test Project.
What is the main test of the charging pile test? What is the main test of the charging pile test? What is the main test of the charging pile test? There are two main directions for charging pile testing, one is the test project of electrical parameters, and the other is the test project of compatibility.
Binance download-APP, download it now, new users will receive a novice gift pack.
1. Nowadays, many battery car charging piles are wholesaled by manufacturers, and the wholesale price through manufacturers will be reduced.For operators who want to buy charging piles, it is very cost-effective to wholesale from manufacturers.
2. ATE-8603 switching power supply automatic test system (DC-DC) is suitable for the characteristic test of switching power supply such as AC/DC or DC/DC power supply, adapter, battery charger, etc. It is tailor-made and optimized for standard test items. It has good test performance and meets a large number of Production test requirements.
3. The charging pile detection equipment recommends the XL-942S/943S charging pile on-site characteristic tester, which can meet the test needs of metrology verification, interoperability detection and protocol consistency detection, and meet the requirements of the testing items in the acceptance stage and operation stage of the national network. And the equipment is highly integrated and portable.
1. First of all, the AC charging pile test project includes the appearance inspection and functional test of the charging pile. The testers will carefully check the appearance of the charging pile, including the integrity of the shell, whether the connector is intact, whether the display and buttons are normal, etc.
2. Charging pile detection project function test: charging function control test, communication function test, insulation detection function test, vehicle plug locking function test, pre-charging function test.
3. It can provide reliability test item services: environmental reliability test, electromagnetic compatibility EMC test, and IP protection level test, etc. Common reliability test services include: vibration, impact, drop, high and low temperature, salt spray test, as well as mold, photoaging and other experiments, and nationally recognized CMA test reports are issued.
XL-942S charging pile test equipment cooperates with XL-3603 load to meet the test requirements of metrology verification, interoperability detection and protocol consistency detection, and meet the requirements of testing projects in the acceptance stage and operation stage of State Grid Document No. 45.
Reliability can provide some test item services: environmental reliability test, electromagnetic compatibility EMC test, and IP protection level test, etc. Common reliability test services include: vibration, impact, drop, high and low temperature, salt spray test, as well as mold, photoaging and other experiments, and nationally recognized CMA test reports are issued.
"JJG 1149-2018 Electric Vehicle Non-vehicle Charger Verification Regulations" Test Project. JJG 1148-2018 Electric Vehicle Non-vehicle Charger Verification Procedures" Test Project. GB/T 34651-2017" Conduction Charging Interoperability Test Project.
What is the main test of the charging pile test? What is the main test of the charging pile test? What is the main test of the charging pile test? There are two main directions for charging pile testing, one is the test project of electrical parameters, and the other is the test project of compatibility.
369.57MB
Check996.82MB
Check167.97MB
Check997.93MB
Check276.18MB
Check284.33MB
Check965.93MB
Check954.73MB
Check628.92MB
Check832.79MB
Check677.87MB
Check824.67MB
Check878.82MB
Check156.14MB
Check171.43MB
Check161.78MB
Check793.64MB
Check227.62MB
Check382.46MB
Check686.69MB
Check833.18MB
Check267.65MB
Check658.63MB
Check194.77MB
Check979.95MB
Check979.51MB
Check481.21MB
Check233.18MB
Check677.62MB
Check944.45MB
Check793.19MB
Check534.86MB
Check193.44MB
Check937.65MB
Check821.44MB
Check821.44MB
CheckScan to install
Binance download to discover more
Netizen comments More
1773 良莠不分网
2025-02-01 03:42 recommend
1387 黯然神伤网
2025-02-01 03:20 recommend
1280 无伤大体网
2025-02-01 03:14 recommend
282 了如指掌网
2025-02-01 02:32 recommend
2651 咎由自取网
2025-02-01 02:24 recommend